Vertiv — In the Era of Boiling Racks, the Company That Sells the Data Center's Heat and Power Together

The power of a single AI rack is heading from 8 kW past 140 kW toward 1 MW. Data center cooling and power infrastructure maker Vertiv (VRT) sells that heat and power bundled in one hand.

HHaelangdal·Founder AnalystJune 20, 202618 min readStock Analysis
Bottom Line

Vertiv is the data center infrastructure company that sells the heat and power of the AI rack bundled under one vendor. It holds both liquid cooling and power, and it is wired directly into NVIDIA's roadmap. A $12.45B backlog, organic orders up about 81% year over year, and a market cap of roughly $128B anchor its standing.

NewMoneyMoves

Global Investment through Themes

Content

ThemesIdeasReportsEarnings

Explore

GuideETFsPerspectivesTelegramNVIDIA PortfolioWeekly ReviewCredit & Leverage

Community

Daily News

Legal

Privacy PolicyTerms of ServiceDisclaimer

© 2026 NewMoneyMoves. All rights reserved.

Reader's Brief — 30-second TL;DR

Advanced
Why Now

Q1 2026 revenue of $2.65B (+30%), adjusted operating margin of 20.8% (+430bps), and adjusted EPS of $1.17 (+83%). Q4 2025 organic orders surged 252% year over year, and backlog reached $12.45B. FY2026 guidance was raised to revenue of $13.5-14.0B and adjusted EPS of $6.30-6.40.

Winners ?? Losers

Beneficiaries: Vertiv, the liquid cooling leaders (Schneider), the power infrastructure chain. Headwinds: hyperscaler capex cyclicality with about 75% of revenue tied to data center customers, the execution variable of EMEA's -29% organic quarter, and a valuation of roughly 49x forward P/E on 2026 estimates.

Watch For

Reading depth

The New Market Created by Surging Rack Power Density

The rules of the data center have changed.

For a long time, a single data center rack consumed about 8 kW. That much heat was cooled with air. Air , blowing in cold air and drawing out hot air, was the standard. It was cheap and the design was simple.

AI broke that line. An AI rack packed densely with GPUs sees its density explode. An NVIDIA GB200 NVL72 rack consumes about 132 kW; the GB300, 142 kW. It will soon exceed 300 kW, and in 2028-2029 a single rack heads toward about 1 MW.

does not vanish. Nearly all of it becomes heat. A rack that consumes 132 kW emits 132 kW of heat. at this level cannot be cooled with air, because air is weak at carrying heat away.

The chart below shows the leap in rack density.

The Leap in AI Rack Power Density (kW/rack)

Source: NVIDIA GB200/GB300 NVL72 reference architectures, Vertiv's own roadmap projection (~1 MW in 2028-2029). Unit: kW.

When density rises, two things become necessary at once. First, cooling to remove that heat. Second, power infrastructure to safely supply that much power. A boiling rack demands cooling and power together.

This is exactly Vertiv's market. The company does not sell heat and power separately; it sells them bundled at the rack level. Cooling equipment, power equipment, and installation and maintenance services are integrated and supplied by a single vendor.

The rack power density heading from 8 kW to 1 MW created an entirely new market that sells cooling and power bundled together.

Full access requires a free account

Sign in with Google to unlock the full body of every free report instantly.

Sign in with Google

This site runs on ads — the tier system rewards community contributions.

Comments

This report is provided for informational purposes only and does not constitute a recommendation to buy or sell any financial instrument. Investment decisions should be made based on your own judgment and responsibility. The analysis and opinions contained herein are based on information available at the time of writing and are subject to change.

All Reports
Home
Company
Company
Macro
Theme